[1]
Isfahani, M.N., Antonius and Wibowo, K. 2025. ANTICIPATION AND SOLUTION OF EQUIPMENT COST OVERRUN FACTOR IN TOLL ROAD CONSTRUCTION PROJECT. JURNAL TEKNIK SIPIL-ARSITEKTUR. 24, 1 (May 2025), 83 - 90. DOI:https://doi.org/10.54564/jtsa.v24i1.222.