Isfahani, M. N., Antonius, & Wibowo, K. . (2025). ANTICIPATION AND SOLUTION OF EQUIPMENT COST OVERRUN FACTOR IN TOLL ROAD CONSTRUCTION PROJECT. JURNAL TEKNIK SIPIL-ARSITEKTUR, 24(1), 83 - 90. https://doi.org/10.54564/jtsa.v24i1.222