Rahalim, A. and Isfahani, M. N. (2024) “TINJAUAN PENGOLAHAN WAKTU DAN BIAYA PEMBANGUNAN CIBINONG CITY MALL 2 - BOGOR”, JURNAL TEKNIK SIPIL-ARSITEKTUR, 23(1), pp. 72 - 79. doi: 10.54564/jtsa.v23i1.167.