Isfahani, M. N., Antonius and Wibowo, K. . (2025) “ANTICIPATION AND SOLUTION OF EQUIPMENT COST OVERRUN FACTOR IN TOLL ROAD CONSTRUCTION PROJECT”, JURNAL TEKNIK SIPIL-ARSITEKTUR, 24(1), pp. 83 - 90. doi: 10.54564/jtsa.v24i1.222.