ANALISIS BIAYA DAN WAKTU PADA PEMBANGUNAN GEDUNG GRAHA CK

Authors

  • Muhammad Nafhan Isfahani

DOI:

https://doi.org/10.54564/jtsa.v19i2.47

Abstract

The concept of earned value is one of the tools used in managing the Graha CK development that integrates cost and time. The concept of earned value presents three dimensions, namely the physical completion of the project that reflects the planned absorption of costs, the actual costs that have been incurred or called the actual costs and what is obtained from the costs that have been incurred or called earned value The purpose of cost and time control analysis in the Graha CK building construction project is to obtain ACWP, BCWS, BCWP on the Graha CK Building construction project, obtain SPI, CPI on the Graha CK Building construction project, obtain ECD, EAC on the Graha CK Building construction project. From the results of the analysis using the earned value concept method to control the cost of the Graha CK building construction project, the results obtained were BCWS 950,338,876, BCWP 984,565,1162, ACWP produced 1,107,128,740,000. SPI 1.04, CPI 0.89. EAC produced 2,080,103,679 and ECD produced 13.72 months.

Published

2020-12-31

How to Cite

Isfahani, M. N. (2020). ANALISIS BIAYA DAN WAKTU PADA PEMBANGUNAN GEDUNG GRAHA CK. JURNAL TEKNIK SIPIL-ARSITEKTUR, 19(2), 78-84. https://doi.org/10.54564/jtsa.v19i2.47

Most read articles by the same author(s)